At full load a Cummins RS20A draws 255,947 BTU/hr of natural gas and needs 3.5 – 12.0 in H₂O (0.87 – 3.0 kPa) at its inlet while running. Whether your existing line delivers that depends on pipe diameter, developed length, pipe material and every other gas appliance on the system.

What the generator actually demands

Full-load fuel consumption, Cummins air-cooled standby range.

Model Output Natural gas, full load LP vapor, full load
RS13A 13kW 217,227 BTU/hr 197,681 BTU/hr
RS17A 17kW 245,954 BTU/hr 242,386 BTU/hr
RS20A 20kW 255,947 BTU/hr 265,783 BTU/hr

For comparison, residential gas furnaces are commonly rated around 40,000 to 120,000 BTU/hr and a tank water heater around 40,000. A RS20A at full load asks for 255,947 BTU/hr on its own — on a lot of houses that is more than everything else on the system put together, arriving as a single new load.

Generator gas consumption chart by Cummins model

Cummins publishes fuel use at four load points, and the figures below are copied from each model’s spec sheet. Size the gas line for the full-load column, because that is what the engine asks for when the air conditioning and everything else come on together.

Natural gas, cubic feet per hour

Model Rated output 1/4 load1/2 load3/4 loadFull load
RS13A 13kW 129 ft³/hr154 ft³/hr187 ft³/hr228 ft³/hr
RS17A 17kW 134 ft³/hr165 ft³/hr215 ft³/hr258 ft³/hr
RS20A 18kW NG / 20kW LP 135 ft³/hr172 ft³/hr223 ft³/hr268 ft³/hr
RS25 25kW 123.8 ft³/hr185.7 ft³/hr247.6 ft³/hr309.5 ft³/hr
RS30 30kW 147.6 ft³/hr219 ft³/hr300 ft³/hr380.9 ft³/hr
RS36 36kW 202.3 ft³/hr292.3 ft³/hr382.3 ft³/hr472.3 ft³/hr
RS40 40kW 209.5 ft³/hr304.7 ft³/hr409.5 ft³/hr519 ft³/hr
RS50 50kW 341.3 ft³/hr481.6 ft³/hr624.6 ft³/hr806.3 ft³/hr
RS60 60kW 363.4 ft³/hr545 ft³/hr729.5 ft³/hr933.8 ft³/hr
RS80 80kW 455.3 ft³/hr678.7 ft³/hr877 ft³/hr1,083.5 ft³/hr
RS100 100kW 549.6 ft³/hr805.4 ft³/hr1,050.8 ft³/hr1,317.7 ft³/hr
RS125 125kW 680.7 ft³/hr1,038.1 ft³/hr1,362.2 ft³/hr1,660.9 ft³/hr
RS150 150kW 750.2 ft³/hr1,175.7 ft³/hr1,545.7 ft³/hr1,907.9 ft³/hr

LP vapor (propane), cubic feet and gallons per hour

Model 1/4 load1/2 load3/4 loadFull load
RS13A 42 ft³/hr (1.15 gal/hr)51 ft³/hr (1.40 gal/hr)64 ft³/hr (1.76 gal/hr)83 ft³/hr (2.28 gal/hr)
RS17A 48 ft³/hr (1.32 gal/hr)63 ft³/hr (1.73 gal/hr)82 ft³/hr (2.25 gal/hr)102 ft³/hr (2.80 gal/hr)
RS20A 49 ft³/hr (1.35 gal/hr)66 ft³/hr (1.81 gal/hr)88 ft³/hr (2.42 gal/hr)112 ft³/hr (3.08 gal/hr)
RS25 51.6 ft³/hr (1.4 gal/hr)75.6 ft³/hr (2.1 gal/hr)99.6 ft³/hr (2.8 gal/hr)125.4 ft³/hr (3.5 gal/hr)
RS30 66.4 ft³/hr (1.8 gal/hr)95.9 ft³/hr (2.7 gal/hr)129.1 ft³/hr (3.6 gal/hr)164.1 ft³/hr (4.5 gal/hr)
RS36 79.8 ft³/hr (2.2 gal/hr)114.1 ft³/hr (3.2 gal/hr)148.4 ft³/hr (4.1 gal/hr)182.7 ft³/hr (5.1 gal/hr)
RS40 83 ft³/hr (2.3 gal/hr)121.7 ft³/hr (3.4 gal/hr)166 ft³/hr (4.6 gal/hr)193.6 ft³/hr (5.4 gal/hr)
RS50 144.8 ft³/hr (3.98 gal/hr)204.7 ft³/hr (5.63 gal/hr)254.3 ft³/hr (6.99 gal/hr)321.6 ft³/hr (8.84 gal/hr)
RS60 151.4 ft³/hr (4.16 gal/hr)217 ft³/hr (5.96 gal/hr)289.3 ft³/hr (7.95 gal/hr)370.2 ft³/hr (10.17 gal/hr)
RS80 181.9 ft³/hr (5 gal/hr)263 ft³/hr (7.23 gal/hr)339.8 ft³/hr (9.34 gal/hr)420.8 ft³/hr (11.56 gal/hr)
RS100 207.5 ft³/hr (5.7 gal/hr)311.8 ft³/hr (8.57 gal/hr)411.2 ft³/hr (11.3 gal/hr)518.7 ft³/hr (14.25 gal/hr)
RS125 No LP vapor table on this model’s Cummins sheet
RS150 No LP vapor table on this model’s Cummins sheet

BTU/hr is the unit gas piping is sized in. Cummins states it for the air-cooled models, in the table above; the liquid-cooled sheets give cubic feet per hour only, so no BTU figure is shown for them here.

LP gallons per hour on the liquid-cooled models are the sheets’ own figures. On the air-cooled models they are the sheet’s cubic feet converted at its stated factor: 36.39 ft³ of LP vapor = 1 US gallon of liquid propane (Cummins conversion factor, same sheet).

Pressure is the number that gets missed

Air-cooled, natural gas: 3.5 – 12.0 in H₂O (0.87 – 3.0 kPa)
Air-cooled, LP vapor: 6.0 – 12.0 in H₂O (1.49 – 3.0 kPa)
RS25, RS30, RS36, RS40, RS50, RS60, RS80, RS100: 6.0 – 14.0 in H₂O (1.5 – 3.5 kPa)
RS125, RS150: Natural gas 6.0 – 13.0 in H₂O (1.5 – 3.5 kPa)

Those are measured at the generator inlet, while it is running at full load. A line can read perfectly acceptable pressure with the engine off and then sag below the minimum the moment it takes load, because pressure drop is a function of flow. The symptom can be a generator that starts, runs briefly and shuts down when the load comes on.

The four things that decide the answer

  • Pipe diameter. Capacity rises steeply with diameter, so going up one trade size often solves a run that looked hopeless.
  • Developed length. Not the straight-line distance — the actual run, with every elbow and tee counted as the equivalent length of straight pipe it behaves like.
  • Material. Black iron, CSST and polyethylene have different capacities for the same nominal size, and CSST in particular is sized off its own manufacturer's tables rather than the generic ones.
  • Everything else on the system. The line is sized on total connected demand. The generator does not get assessed on its own.

Those four are why gas work is priced after the survey rather than from a photograph, and the survey tells you which of the four is the constraint at your house.

Your gas line: two ways to do it

Our licensed electricians do the electrical work. The gas line is plumbing, so in Texas it is run by a licensed plumber, or by your propane company on an LP system. You choose how that gets arranged.

We handle it

We hire a licensed plumber, schedule them around the electrical work and the inspections, and show the gas line as its own line item in your written quote. You have one contact for the whole job, and we stand behind the gas line we arranged: if it fails because of how it was installed, call us and we get it fixed at no charge.

You hire your own

Some homeowners save money by hiring a licensed plumber or their propane company directly for the gas portion. We take the gas line out of our quote and give your plumber what they need to size it: the generator's fuel demand and required inlet pressure from the Cummins specification sheet, and where the pad will sit. Your plumber warrants their own work.

Either way, a gas meter upgrade, if your house needs one, is the gas utility's work on its own schedule, and the city inspects the gas line under its own permit.

When the meter has to change

Occasionally the pipe is not the constraint and the meter is. A residential meter is sized for the house it was set for, and adding a 20kW generator can push total demand past what it is rated to deliver. That is a request to the gas utility — Atmos Energy in most of this market — rather than work we perform, and it happens on the utility's schedule, so we raise it at the survey rather than a week before the install.

Where this sits in the cost

The gas side is the most variable line on a generator install, which is why the installed bands we publish are bands rather than prices. If your meter has spare capacity and sits near the generator location, the gas work is straightforward. If a long run has to be upsized through a finished wall, it is not. The full breakdown is on what a whole house generator really costs in DFW, and how installation actually works sets out where in the sequence this gets settled.

If you have not chosen a fuel yet, that decision comes first and changes everything on this page: natural gas, propane or diesel.

Questions

How much natural gas does a standby generator use per hour?

At full load, per the Cummins spec sheets: RS13A 228 ft³/hr, RS17A 258 ft³/hr, RS20A 268 ft³/hr, RS25 309.5 ft³/hr, RS30 380.9 ft³/hr, RS36 472.3 ft³/hr, RS40 519 ft³/hr, RS50 806.3 ft³/hr, RS60 933.8 ft³/hr, RS80 1,083.5 ft³/hr, RS100 1,317.7 ft³/hr, RS125 1,660.9 ft³/hr, RS150 1,907.9 ft³/hr. The chart on this page gives every model at quarter, half, three-quarter and full load, and the gas line is sized for full load.

Does a generator need a bigger gas line?

Often. A RS20A at full load draws 255,947 BTU/hr on natural gas, which on many homes is more than the furnace, range and water heater put together. Whether your existing line carries it depends on the pipe diameter, how far it runs, and what else is connected. Sometimes the existing line is fine. Sometimes a section has to be upsized. Occasionally the meter itself does.

What gas pressure does a Cummins standby generator need?

3.5 – 12.0 in H₂O (0.87 – 3.0 kPa) on natural gas, or 6.0 – 12.0 in H₂O (1.49 – 3.0 kPa) on LP vapor. The figure that matters is the pressure at the generator inlet while it is running at full load, which is not the same as the pressure sitting there with everything off. A line that reads fine at rest can sag below the minimum the moment the engine takes load, and that shows up as a unit that starts and then shuts down.

Who pays to upsize the gas meter?

The meter belongs to the gas utility, so upsizing it is a request to them rather than work we perform. In this market that is usually Atmos Energy. Ask the utility whether it charges for the change. It runs on the utility's schedule, which is why we raise it at the survey rather than at the install. The piping on your side of the meter is run by a licensed plumber: on a turnkey job we hire one and it is a line item in our quote, or you can hire your own plumber and we give them the generator's fuel demand and inlet pressure to size it.

Do your electricians run the gas line?

No. Gas piping is plumbing work, so it is done by a licensed plumber, or by your propane company on an LP system. Our crews do the electrical side. On a turnkey job we hire and schedule the plumber and stand behind the gas line; if you would rather hire your own plumber to save money, we take the gas line out of our quote and that plumber warrants it.

Can the generator share the line with my furnace and water heater?

Yes, and it normally does. Gas systems are sized on total connected demand, so the question is not whether the generator can share the line but whether the line was sized for everything at once. A standby generator is an intermittent load, but it has to be treated as a real one because it runs exactly when the heating is also running — an ice storm is when both happen together.

Why does propane change the pipe sizing?

Propane carries roughly two and a half times the energy per cubic foot of natural gas, so a given BTU demand moves less gas volume and can travel through a smaller pipe. The pressure requirement is different too — 6.0 – 12.0 in H₂O (1.49 – 3.0 kPa) on LP against 3.5 – 12.0 in H₂O (0.87 – 3.0 kPa) on natural gas. What propane adds instead is the tank: it has to be large enough to vaporize at the rate the generator consumes, which is a cold-weather question rather than a pipe question.

Air-cooled fuel consumption and pressure figures from Cummins Power Generation spec sheet NAS-6254-EN (A056T581), RS13A / RS17A / RS20A / RS20AC, retrieved 2026-08-19. Verify against the current Spec D sheet for the exact part number quoted. Liquid-cooled figures from the Cummins RS-series spec sheets (RS25 NAS-5775d-EN (4/15); RS30 NAS-5776d-EN (4/15); RS36 NAS-5777d-EN (4/15); RS40 NAS-5778d-EN (4/15); RS50 NAS-6168-a-EN (1/16); RS60 NAS-6169-a-EN (1/16); RS80 NAS-6170-a-EN (1/16); RS100 NAS-6171-a-EN (1/16); RS125 NAS-6309 (A058X609) (10/17); RS150 NAS-6310 (A058X610) (10/17)), published in the Cummins spec-sheet library, retrieved 2026-10-09.

We measure it, we do not estimate it

The survey includes the gas assessment: meter capacity, existing demand, the run and the pressure under load. You get the number in writing before anything is ordered.

Rather just talk to someone?

Leave a number and we will call you. No sales script, no obligation.

We call back within one business hour, Mon–Fri 7am–6pm and Sat 8am–noon. We do not sell your details to anyone.

Call Now Get a Quote